[email protected]

Home   |   Floating Dock

Floating Dock

  • HDPE Plastic Jet Ski Dock
  • HDPE Plastic Jet Ski Dock
  • HDPE Plastic Jet Ski Dock
HDPE Plastic Jet Ski DockHDPE Plastic Jet Ski DockHDPE Plastic Jet Ski Dock

HDPE Plastic Jet Ski Dock

  • Material: high-density polyethylene (HDPE)
  • Buoyancy: 325KG/㎡
  • Weight:7kgs±0.3kg
  • floating dock, pier, fishing platform, fish farm, walk way, pontoon bridge
  • Product description: Floating Cube Floating boat dock cube丨Floating Dock Cubes丨Pontoon Cubes丨Floating Plastic Docks for Boats and Watercraft丨High quality Molecular HDPE Floating wharf
  • INQUIRY

HDPE Plastic Jet Ski Dock


Product Description

Material
Weight
Working Temperature
Buoyancy
Color
HMWHDPE
7± 0.30 kg/pc
-60 ºC~80 ºC
325kg/㎡
Orange, Blue, Grey

Function:

1. Used to protect the jet ski from corrosion or algae.

2. Be used to build floating dock, pier, fishing platform, fish farm, walk way, pontoon bridge, swimming pool.

Feature:

Imported PE with UV inhibitor,durable,environmentally friendly.

Load Capacity:

Each one square meter is made up of four pontoons, top load is 325kgs.
Draft without load: 2.5-3cm;
Draft with load of 150kgs: 15-20cm(safe);
Draft with load of 300kgs:35-40cm(load limit)

Anti Wind Wave:
1.The wave on water surface between 2-class and 3-class belongs to safe applicable range.
2.The wave on water surface between 3-class and 6-class can be applicable; however, the safety protection must be reinforced.
3.The wave on water surface between 6-class and 9-class is the restricted applicable range (It is suggested that the shipping shall not be parked and the visitors shall not be in or out).

Attention:
To avoid shaking of the dock, the area of internal lake’s dock is not less than 30 square meter; the area of stage is not less than 100 square meter.

Anchoring:
1.If water is less than 3m in depth, steel piles are to be put in proper place and then connected by wheels, which can prevent the floating dock from moving laterally but can automatically rise and fall in line with water level.
2.If water is over 3m in depth, anchoring can be used by sinking the anchorage block pulled by steel cables to the water bottom.


Floating Dock Packing: Nude Packing

20'GP : 240PCS   40'HQ: 620PCS

Delivery Details : 25 days after received the deposite.